Quick answer

In short

A pressure treated deck in Ontario costs roughly $30 to $65 per square foot built, cedar $45 to $80, and composite $55 to $95. A common 12×16 deck lands between about $7,000 and $18,000 depending on material.

The decision that moves your price most is not which board you pick. It is how high the deck sits. A ground-level deck adds nothing; a raised deck adds $2,000 to $5,000; a second-storey deck adds $5,000 to $15,000 — because height means deeper footings, structural framing, stairs and railings.

Height also decides whether you need a permit: most Ontario municipalities require one above 24 inches (0.6 m) from grade, or when the deck is attached to the house.

Price per square foot by material

MaterialPer sq ft, built
Pressure treated$30–$65
Cedar$45–$80
Composite$55–$95
PVC$65–$95
Ipe and other hardwoods$80–$120

Two Ontario builders published overlapping but not identical ranges this year, which is normal: one prices simple ground-level work, the other includes raised structures. Where your project sits in the range depends far more on the frame than the finish.

Typical totals by size

SizeAreaTypical total
12×16192 sq ft$7,000–$18,200
14×20280 sq ft$12,600–$26,600
20×20400 sq ft$18,000–$38,000

What adds to the price

ItemCost
Frost footings$150–$300 each, typically 6 to 12 needed
Raised deckadds $2,000–$5,000
Second-storey deckadds $5,000–$15,000
Wood railing$40–$120 per linear foot
Glass railing$180–$300 per linear foot
One flight of stairs$400–$800 in labour
Removing the old deck$500–$2,500
Permit$150–$600 by municipality

Glass railing deserves its own warning. At $180 to $300 per linear foot it can add more than ten thousand dollars to a mid-sized deck — more than the difference between pressure treated and composite decking across the whole surface.

Do I need a permit for a deck in Ontario?

In most municipalities, yes if the deck is more than 24 inches above grade, and yes if it is attached to the house. A low floating deck under that height is often exempt — but “often” is doing real work in that sentence, because the rules are municipal and they differ.

Frost footings are the reason a deck permit exists. Ontario ground moves as it freezes and thaws, and a deck on shallow piers lifts, twists and eventually pulls away from the house. That inspection is checking the thing you cannot see once the deck is built.

Our permit guide covers who applies and what happens at inspection.

Pressure treated, cedar or composite?

  • Pressure treated is the cheapest and the most common. It needs cleaning and re-staining every few years, and it looks its age.
  • Cedar costs more, looks better, and still wants maintenance. It weathers to grey unless you keep after it.
  • Composite costs the most up front and asks very little afterwards: no staining, no splinters. It gets hot in direct sun, and cheaper composite boards fade.

A useful way to decide: composite is bought by people who do not want a Saturday job every spring, and that is a legitimate reason to spend the money. Just do not expect it to be maintenance-free — it still needs washing.

Red flags in a deck quote

What you seeWhy it mattersWhat to do
No footing detailFooting depth and count is the structure; everything else is finishAsk how many footings, how deep, and whether a permit and inspection are included
Permit described as unnecessary without checkingHeight and attachment decide it, and the rule is municipalAsk the contractor which municipal rule they are relying on, then confirm it yourself
Railing not itemisedGlass railing can cost more than the entire deck surfaceAsk for railing as a separate line, priced per linear foot
Ledger attachment not describedA badly flashed ledger board is how attached decks collapse and how walls rotAsk how the deck attaches to the house and how the ledger is flashed
Spring booking with a large depositDeck season is short and busy; deposits taken in March for June work carry real riskKeep the deposit at 10% and tie the next payment to materials arriving
No mention of old deck removalDemolition and disposal runs $500 to $2,500 and often appears laterConfirm in writing who removes and disposes of the old structure

What to do next

Measure the footprint you want and check the height from the ground to where the deck surface will sit. Those two numbers — area and height — determine both your price range and whether you need a permit, and they make three quotes comparable.

Book early. Ontario’s deck season runs roughly May to October and good builders are committed by spring, which is exactly when everyone starts calling.

Check each company with our contractor checklist, and read your rights on a renovation contract before paying a deposit for work months away.

Carpenter Bee is a classified directory. We do not vet the companies listed here and a listing is not a recommendation.

Frequently asked questions

Keep it low to the ground, keep it rectangular, use pressure treated lumber and keep railings simple. Height, complex shapes and glass railings are where deck budgets actually go.

A straightforward ground-level deck is usually a few days once materials arrive. Raised decks with stairs and railings take a week or more, and permit review adds time before any of it starts.

Typically six to twelve at $150 to $300 each, depending on size, height and framing. Ontario footings must reach below the frost line, which is what the building inspection is checking.

Most municipalities require a permit for decks more than 24 inches above grade and for any deck attached to the house. Low floating decks below that height are often exempt, but the rule is municipal so confirm with your city.

It costs the most up front and removes the annual staining. It also gets hot in direct sun and cheaper boards fade. If avoiding maintenance is worth money to you, it is a reasonable trade.

Pressure treated runs $30 to $65 per square foot built, cedar $45 to $80 and composite $55 to $95. A 12×16 deck typically costs $7,000 to $18,200 depending on material and how high it sits.

Sources

  • local.click, Deck cost per square foot in Ontario, 2026 — local.click
  • Decks for Life, How much does a deck cost in Toronto in 2026, updated 13 April 2026 — decksforlife.ca
  • Government of Ontario, Your rights when starting home renovations or repairs — ontario.ca, checked 18 September 2026

Prices are published builder ranges collected on 18 September 2026, not quotes. Permit rules are municipal — confirm with your city.

More Carpenter Bee guides

Keep reading

continue reading

Related Posts

Go to Top